logo of Geostroy AD
Menu
  • Home
      • About Geostroy

        About Us

        Certificates and licences

        Membership

        Team and resources

        Awards

        Company policy

        Careers

        Read more
      • Business units
        INFRASTRUCTURE PROJECTS

        INDUSTRIAL PROJECTS

        CIVIL PROJECTS

        MINING OPERATIONS

        LAND SURVEYING SERVICES
        Read more
      • Contacts

        Telephone:+359 2 902 40 90
        Fax:+359 2 958 20 14
        Email: office@geostroy.com

  • About GEOSTROY AD
      • About us
      • Certificates and licences
      • Membership
      • Awards
      • Team and resources
      • Company policy
      • Careers
      • Certificates and licences
      • Awards
  • Business units
      • MINING OPERATIONS
      • LAND SURVEYING SERVICES
  • Projects
      • CURRENT PROJECTS
      • Completed Projects
          • DESIGN AND CONSTRUCTION OF INFRASTRUCTURE PROJECTS
          • DESIGN AND CONSTRUCTION OF INDUSTRIAL PROJECTS
          • DESIGN AND CONSTRUCTION OF CIVIL PROJECTS
  • News
      • News
      • Archive News
  • CSR
  • Contacts

ROAD II-81 KOSTINBROD – BUCHIN PROHOD

 
  • Employer: Road Infrastructure Agency
  • Contractor: Patishta 2016 – First Stage Consortium
  • Project completed in 2019

Patishta 2016 – First Stage Consortium with a leading partner Geostroy AD and partners Patstroy-92 AD, Roads and Equipment EAD and Dimas AD started the rehabilitation of the second-class Road II-81 Kostinbrod – Buchin Prohod from km 8+200 to km 30+400.

Two bridges – over the River Blato and the River Buchino – will be renovated, as well as 13 road junctions.

Effective road drainage will be ensured by building new lined trenches, concrete curbstones and drainage shafts.

The implementation of the project will improve the quality of the entire road section, thus increasing traffic safety.

The section will be equipped with new road restraint systems, horizontal road markings and traffic signs. The time for completing the construction works is 15 months.

The project is funded under the Operational Programme Regions in Growth 2014-2020.

  • Bulgarian (BG)
  • English (UK)
Privacy policy            COOKIES Copyright © Geostroy. Created by ITR SERVICES
 
geostroy

Login form

Login with Facebook
Login with Google
  • Forgot your username?
  • Forgot your password?