UNDERGROUND PROJECTS ON THE TERRITORY OF ELLATZITE MINE COMPLEX

  • Employer: Ellatzite-Med AD
  • Contractor: Geostroy AD
  • Project completed in 2017

Over the years, GEOSTROY has carried out a large number of underground projects. The most significant of them can be outlined as follows:

  • Strengthening of an ore transport tunnel with a built-in trunk belt conveyor to transport extracted ore material from Ellatzite Mine Complex near the town of Etropole to the Flotation Complex near the village of Mirkovo.
  • Construction of a bypass transport gallery for servicing a clearwater tunnel.
  • Supplementary construction of water-catchment facilities on the River Negarshtitsa – extension of an existing mine gallery for clear waters – Section 2: Construction of a mine gallery.

The tunnel galleries are executed using a classical technology – drilling and blasting works with various cross sections ranging from 7.1 m2 to 12.85 m2, and the lining of the walls is consistent with the geological-engineering conditions.

  • Bulgarian (BG)
  • English (UK)
geostroy

Login form

Login with Facebook
Login with Google
  • Forgot your username?
  • Forgot your password?

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.

Learn more